Latest Announcements

2 September 2010
LATEST NEWS
- Exploration Update
- Mt Magnet Project (WA) Update
- High Grade Drill Results at Wattle Dam
- Media Release - Grades up to 718 grams per tonne
2 September 2010
Investor Presentations
- Investor Presentation September 2010

Latest Reports

31 August 2010
- 2010 Annual Financial Report

WATTLE DAM REGIONAL PROJECTS

 

 

UNDERGROUND DRILLING

 

A significant drill hole program from the 137 RL drill cuddy commenced in late May 2010. Holes targeted the down-plunge extension of the Wattle Dam main lode zone between the 100 and 125 RL (225m vertical extent). At the end of the quarter, 22 NQ diamond holes had been completed and drilling is ongoing.

 

Drilling to date shows that the main lode structure and alteration zone can be traced down-plunge. However, it generally lacks the coarse gold and super high-grades seen in the upper 200m of the deposit. Minor amounts of visible gold have been logged and some moderate intercepts have been returned. The best intercept received to date is 8 m at 6.7 g/t from 147 m in WDUD0113. Sampling, assay and data collation of the drilling will be completed in late August 2010. A new model will be generated and evaluated during the September 2010 quarter.

 

 

 

 

 

 

 

 

 

 

Share Price

ASX: RMS
$0.64
Volume: 891,831

Subscribe

Enter your email address to join our email newsletter

Ramelius Resources

140 Greenhill Road

Unley SA 5061

GPO Box 1373

Adelaide SA 5001

 

Ph: (08) 8373 6473

Fax: (08) 8373 5917